How to Specify the Correct Workmanship Class, and What to Verify Before You Make Your Sourcing Decision
A quote for a new control assembly comes back with a line that just says, “Built to IPC standard.” No class called out. The engineering team assumes that means the good stuff—IPC is IPC, after all—and signs off.
Read More