Quick Checklist Before You Make Your Control Panel Sourcing Decision
An OEM engineering team collects three quotes for a control panel that will ship inside a new machine, and perhaps their BOM isn’t as well defined as it should be, leaving room for error. All three proposals appear nearly identical on paper—similar components, comparable lead times, etc. The team goes with the lowest bid and moves on.
Read More